# The implementation test.

Report: https://www.gatherhq.com/reports/it-leaders-2026

Type: see_published_methodology

Published aggregates and report text only, not respondent-level records. Values retain their displayed precision. Do not infer counts, missing denominators, weights, confidence intervals or statistical significance. Multiple-response questions may total more than 100%. Fictional choice exercises are not observed purchases. Illustrative and simulated results are not surveys of real people. Read each chart question, notes and the report methodology before comparing results.

# The implementation test.

## Six extra weeks cost the specialist 30 recommendations.

Fictional choice exercise. Dots represent aggregate counts, not tracked individual switches.

## A better product still needsa place on the calendar.

At equal prices, the new specialist had the advantage: 66 recommendations from 117 IT leaders, against an incumbent extension and the option of making no change. Both products met requirements. Funding was available. Deployment would take six weeks in either case. The difference was the claim on manual effort, a 20% reduction for the specialist versus 10% for the incumbent.

Now allow the specialist twelve weeks. Its recommendation count drops to 36. That is a loss of 30 on a net basis, not 30 identifiable defectors; the paired results include movement both ways. Keeping the current setup, at 32%, edges ahead of the specialist's 31%.

This particular comparison comes from a fictional exercise, not a sales pipeline. It nonetheless puts a useful limit on the proposition that a superior benefit sells the change. The benefit was still there. So were the funds and the technical fit. What the offer had lost was six weeks.

There is a reason to put this result ahead of the budget findings. Ninety-five participants expected their relevant budget to increase over the coming year, which on its own reads as a receptive market. Capacity to implement and security or compliance approval were also the joint leading barriers to worthwhile investments, each selected by 32%. A rising budget is a poor substitute for finding out who can do the work.

The response to independent verification was less dramatic than either the price or rollout response. Verification added 4.3 percentage points of net support. A 20% price increase removed 23.9 points; the longer rollout removed 25.6. These are three separate changes to the starting offer, not cumulative changes. It would be rash to turn them into a universal ranking of buyer concerns. It would be equally rash to omit the transition plan from the case for a better product.

expect a larger budget

name implementation capacity

use AI routinely at work

## Change the offer.Watch the recommendation.

The starting offer gave the specialist a fair shot. Both options met requirements, fitted the stack, could be funded, cost the same, and took six weeks to implement. The specialist claimed a 20% reduction in manual effort, against 10% for the existing supplier’s extension. It won 56% of recommendations.

A 20% price increase cut that share to 32%. A twelve-week rollout cut it to 31%. Each variant reset to the original offer; respondents were not watching one proposal deteriorate in stages. Verifying the benefit independently lifted support to 61%.

### The stronger benefit does not preserve the recommendation.

Proof helped, but the net gain was smaller than the losses associated with higher price or a longer rollout. Even that gain hides movement in both directions: 18.8% of respondents switched toward the specialist when its benefit was verified, while 14.5% moved away. The net lift was 4.3 percentage points. Verification did not produce a uniform response.

The rollout result appeared across company sizes. Specialist support fell from 67% to 42% at organizations with 200–999 employees, from 44% to 17% at 1,000–4,999, and from 57% to 32% at 5,000 or more. The last group contained fewer than 30 respondents, so the subgroup findings are directional.

For an account team, this is a reason to revisit the deployment plan before adding another benefit slide. Find out what occupies those six weeks. If the buyer cannot free the people or obtain the approvals, a stronger product claim leaves the objection intact.

> ROI, cost and time to value. Proven saving in our env matters. I picked existing when time doubled to 12 weeks.CIO, financial services. Excerpt from the published respondent comment.

## The budget may grow.The project can still be blocked.

Ninety-five of the 117 participants expected the budget relevant to their work to increase. That is encouraging for suppliers. It does not tell them which projects the organization can absorb.

When participants named the constraints that most often stop a worthwhile investment, implementation capacity and security or compliance approval tied at 32%. Uncertain return followed at 30%, and funding at 27%. The spread is small. The useful question in a deal is which of these constraints needs resolving first.

### put time to value among their top three decision criteria.

### A closely grouped set of constraints.

The priorities are broader than a cost-cutting brief, too. Reliability appeared in 45% of top-three outcome selections, business growth in 42%, and employee or customer experience in 40%. A proposal has to connect the operational improvement to the work the organization is trying to do.

One result would be easy to misread in a survey dashboard. Time to value appeared among the top three decision criteria for just 21%, well below proven effectiveness at 44%. Yet a longer rollout changed the fictional recommendation substantially. A recalled priority list and a concrete offer ask different questions. Low placement in the first does not make the criterion safe to ignore in the second.

Ask who will implement the change, what else those people are committed to, and what must happen before they can start. The answers belong in the proposal. Otherwise the delivery team may discover the constraint only after the sponsor has sold the idea internally.

> I had to compromise on purchasing a new software solution due to a competing business deadline. It was a compromise because we needed the new technologyCIO, retail or CPG. Published respondent comment.

## Being known does notcomplete the investment case.

Analysts were the most common information source: 71% of participants used them to evaluate technology. Vendor content reached 56%, review sites 52%, and AI assistants or chat tools 45%. Those numbers describe where buyers look.

What they credited with influencing a recent decision was more specific. A trial in their own environment and a quantified business case each appeared in 32% of top-two selections. Analyst recommendations appeared in 16%. These are separate questions with different response formats, not stages in a measured funnel. Still, the practical distinction is useful: being known does not complete the investment case.

### Trials and business cases lead the evidence buyers credit.

Which two types of evidence carried the most weight in that decision? Rank your top 2.

needed more than one sign-off

needed four or more

The sponsor usually needed help getting to yes. Seventy-seven percent reported more than one sign-off; 27% needed four or more. Give that sponsor a document colleagues can inspect without attending the sales presentation. State the expected result, the assumptions behind it, the implementation demand, and the questions still open.

The comparison should include routes that generate no new software contract. Twenty-six percent built internally or adopted open source in the recalled decision. Another 9% stayed with the current approach without a new commitment. A competitor slide that lists only vendors misses those alternatives.

Most recalled decisions moved fairly quickly: 72% concluded within three months. That measures evaluation and approval, not deployment. Waiting until signature to involve delivery leaves little opportunity to address implementation concerns while the decision is still being made.

## AI adoption is broad.Permission is specific.

Retiring an application is a different proposition from tuning resource allocation. Participants made that distinction even though most were already using AI: 43% had it in most team workflows and 42% used it day to day for some tasks.

For resource allocation, 46% would authorize production actions within approved limits and with exception review. For application retirement, only 32% would. Approval before every action was the most common retirement response, at 41%. A broad AI-adoption number misses this difference in authority.

### The task changes what leaders will allow.

The distinction should be visible in a demonstration. Show the point where the system proposes an action, who can approve it, what it may do without asking, and what happens when it reaches a limit. A buyer should be able to follow an exception all the way back to a person.

These answers describe what respondents would authorize under current controls, not systems already operating at those levels. Even the most permissive response retained limits and exception review. There was no option for unrestricted autonomy.

Product and security teams should agree an approval policy for each action before expanding access. In a pilot, review overrides, exceptions, and recovery outcomes against agreed criteria. Counting users tells them how widely AI is used; it does not settle what those users should allow it to do.

## Put the workinto the offer.

The first question for a stalled opportunity is worth changing. Before asking what further benefit would persuade the buyer, ask what makes the proposed work difficult to take on. The study points to four places to look. These are recommendations for practice, not interventions tested in the research.

### Put a delivery owner beside the account owner

Have sales engineering and delivery agree the staffing, dependencies, security review, and first usable outcome before the proposal goes out. Keep a record of unresolved dependencies and start-date changes. Where capacity is tight, explore a smaller first deployment. Price is a separate discussion.

### Build the evidence with the reviewers

Ask the sponsor who signs off and what each reviewer needs. Use that list to shape the trial and business case. Record which assumptions have been accepted and which remain disputed; do not count a document as complete merely because it has been sent.

### Price the alternatives honestly

Finance and the business sponsor should compare the offer with renewal, internal development, open source, and staying put. Use their actual costs, effort, and service performance. If the current approach is adequate, the proposal needs a stronger reason to change, not a more flattering comparison.

### Make AI permissions part of acceptance

For every production action, specify the approval rule, operating limits, exception route, and recovery process. Product, IT, and security owners should review the pilot against those requirements before authorizing broader use.

There is a promising message to test: 42% chose more predictable work as the promise most likely to earn a closer look, ahead of less manual effort at 29% and lower ongoing costs at 28%. The delivery plan is where that promise becomes credible. It should tell the buyer when the improvement arrives, what their team must contribute, and how the organization will stay in control.

## Know what thesenumbers can say.

Gather’s IT Leaders Research Report covers 117 US respondents at organizations with at least 200 employees. Interview dates were September 27–28, 2026, UTC. One incomplete record was excluded. Results are unweighted and descriptive of the participants; this is not a population estimate for all US CIOs or IT leaders.

Participants included heads of IT or IT directors (34.2%), VPs of IT or infrastructure (25.6%), CIOs (25.6%), CTOs whose primary mandate was enterprise IT (13.7%), and deputy CIOs (0.9%). The report is therefore described as IT-leader research rather than a CIO-only survey.

Technology companies accounted for 43.6% of respondents, retail or CPG for 22.2%, financial services for 14.5%, healthcare or life sciences for 12.8%, and manufacturing or logistics for 6.8%. Organization sizes were 200–999 employees (41%), 1,000–4,999 (35%), and 5,000 or more (24%). The technology-heavy composition limits broader generalization.

The instrument included reported priorities, budget expectations, a recalled technology decision, information and evidence sources, current team AI use, intended authorization, and a fictional choice exercise. Each choice variant reset to the original offer. Price, verification, and rollout variants were separate comparisons, not successive changes to one offer. Recommendations in that exercise are stated choices, not observed buying behavior.

Percentages retain the published precision. Top-two and top-three measures describe inclusion among selections, not first-place rankings; multiple-response totals can exceed 100%. Where published counts are available, percentage-point changes use those counts rather than rounded chart values. No statistical significance or population margin of error is claimed.

This edition reorganizes the published report and its downloadable aggregates. It does not reanalyze respondent-level records. The public methods note does not specify recruitment, response rate, interview mode, or the detailed quality-screening process beyond the incomplete-record exclusion. Those details should be confirmed before making broader methodological claims.

These aggregates retain the original published labels and precision. They are the source values behind this interactive edition; they do not include individual responses.

### 1. Reliable operations support a wider business agenda

Which three outcomes matter most to your success over the next 12 months? Rank your top 3.

Top three selections · respondents may select more than one

### 2. Effectiveness needs integration and security fit

Which three criteria most influenced that decision? Rank them in order.

Top three selections · respondents may select more than one

### 3. Most expect a larger budget over the next year

Compared with the past 12 months, how do you expect the budget relevant to your work to change over the next 12 months?

Share of respondents · totals rounded to 100%

### 4. Capacity and approval are joint leaders among constraints

Which two constraints most often stop a worthwhile technology investment from going ahead? Rank your top 2.

Top two selections · respondents may select more than one

### 5. What changes the recommendation

Share recommending the new specialist under each fictional condition

Original offer: equal cost and six-week rollout; specialist claims 20% less manual effort versus 10%. Both options meet requirements, fit the existing stack, and can be funded. Variants independently raise its price by 20%, verify its benefit, or double rollout time. Each resets to the original offer; lines connect the comparisons, not a timeline.

### 6. The movement behind the net change

Respondents switching toward or away from the specialist, compared with their original choice

Percent of all respondents within each persona. Each half of the plot spans 0–50%. Net movement is calculated from unrounded shares.

### 7. How the response varies by company size

Share recommending the specialist within each organization-size band

Darker cells indicate a higher share. † Fewer than 30 respondents; directional only.

### 8. AI use has moved into daily work

Where is your team today with using AI tools in its own work?

Share of respondents · totals rounded to 100%

### 9. IT: permission changes with the action

For each of these tasks, what's the highest level of automation you'd authorize today under your organization's current controls?

Each task totals 100% after rounding. “Approved limits” still includes exception review; it does not mean unrestricted autonomy.

### 10. Where the recent decision ended

What did your organization ultimately do?

Share of respondents · totals rounded to 100%

### 11. How many people signed off

Counting yourself, how many people had to sign off before that decision was final?

Share of respondents · totals rounded to 100%

### 12. How long the decision took

From the first serious look to a final decision, roughly how long did that decision take?

Share of respondents · totals rounded to 100% · vertical scale 0–100%

### 13. Where respondents look for information

When you're evaluating a new technology, which of these sources do you actually rely on?

Sources used · respondents may select more than one

### 14. Which promise earns a closer look

Which of these messages would most likely earn a closer look from you for a tool in the category you described?

Share of respondents · totals rounded to 100% · vertical scale 0–100%

### 15. What carried weight in the recent decision

Which two types of evidence carried the most weight in that decision? Rank your top 2.

Top two selections · respondents may select more than one

### 16. Roles

117 respondents

### 17. Industries

117 respondents

### 18. Organization size

117 respondents

The score is a limited diagnostic, not proof of authorship or report quality. The full authored narrative, recommendations and methodology were submitted. Headings, chart labels and attributed quotations were excluded. The free Sapling service processes only the first 2,000 characters. The identical submitted prose previously scored 24.0% on model 1.3.4. This fresh result uses 1.3.5-cutover. AI Text Detector was retired after an older IDG control passage scored 75/100 and its feedback cited phrases absent from the drafts.

## Complete published text

Skip to reportGather research / IT leaders 2026
THE IT LEADERS STUDY / 2026Interactive edition 04 NOV 2026
The implementation test.
Six extra weeks cost the specialist 30 recommendations.
Explore the trade-off ↘
SAME BENEFIT. DIFFERENT SCHEDULE.01 / 04
66/ 117
recommend the specialist
Fictional choice exercise. Dots represent aggregate counts, not tracked individual switches.
117 US IT leadersOrganizations with 200+ employeesSeptember 2026 fieldworkScope & methodology ↘
00THE CENTRAL FINDING
A better product still needsa place on the calendar.
At equal prices, the new specialist had the advantage: 66 recommendations from 117 IT leaders, against an incumbent extension and the option of making no change. Both products met requirements. Funding was available. Deployment would take six weeks in either case. The difference was the claim on manual effort, a 20% reduction for the specialist versus 10% for the incumbent.
Now allow the specialist twelve weeks. Its recommendation count drops to 36. That is a loss of 30 on a net basis, not 30 identifiable defectors; the paired results include movement both ways. Keeping the current setup, at 32%, edges ahead of the specialist's 31%.
This particular comparison comes from a fictional exercise, not a sales pipeline. It nonetheless puts a useful limit on the proposition that a superior benefit sells the change. The benefit was still there. So were the funds and the technical fit. What the offer had lost was six weeks.
There is a reason to put this result ahead of the budget findings. Ninety-five participants expected their relevant budget to increase over the coming year, which on its own reads as a receptive market. Capacity to implement and security or compliance approval were also the joint leading barriers to worthwhile investments, each selected by 32%. A rising budget is a poor substitute for finding out who can do the work.
The response to independent verification was less dramatic than either the price or rollout response. Verification added 4.3 percentage points of net support. A 20% price increase removed 23.9 points; the longer rollout removed 25.6. These are three separate changes to the starting offer, not cumulative changes. It would be rash to turn them into a universal ranking of buyer concerns. It would be equally rash to omit the transition plan from the case for a better product.
81%expect a larger budget
95 of 117 participants
32%name implementation capacity
Among their top two barriers
85%use AI routinely at work
Most workflows or day-to-day tasks
01THE TRADE-OFF
Change the offer.Watch the recommendation.
The starting offer gave the specialist a fair shot. Both options met requirements, fitted the stack, could be funded, cost the same, and took six weeks to implement. The specialist claimed a 20% reduction in manual effort, against 10% for the existing supplier’s extension. It won 56% of recommendations.
A 20% price increase cut that share to 32%. A twelve-week rollout cut it to 31%. Each variant reset to the original offer; respondents were not watching one proposal deteriorate in stages. Verifying the benefit independently lifted support to 61%.
THE STARTING POINTSpecialist benefit claim20% less manual effort
Incumbent benefit claim10% less manual effort
Both optionsFunded, fit the stack, meet requirements
EXHIBIT 01 / TESTED OFFERSThe stronger benefit does not preserve the recommendation.
ORIGINAL OFFER56%
recommend the specialistStarting offer
PriceEqual to incumbent
Rollout6 weeks
Benefit claim20% less manual effort
VerificationNot independently verified
Share recommending the specialist
0%25%50%75%100%
Equal prices and a six-week rollout for both options.
Each variant resets to the original offer. These are separate comparisons, not cumulative changes or a time series. Published rounded shares.
Question, source & data +Fictional recommendations, not observed purchases. Study n=117, US IT leaders, September 27–28, 2026. Unweighted. Published figure 5. Item-specific bases are not supplied in the chart records.
Share recommending the new specialist under each fictional conditionResponseMeasureShare
Original offerIT leaders56%
Higher priceIT leaders32%
Verified benefitIT leaders61%
Longer rolloutIT leaders31%
View published research ↗
Proof helped, but the net gain was smaller than the losses associated with higher price or a longer rollout. Even that gain hides movement in both directions: 18.8% of respondents switched toward the specialist when its benefit was verified, while 14.5% moved away. The net lift was 4.3 percentage points. Verification did not produce a uniform response.
INSIDE THE VERIFICATION RESULTMoved away
14.5%
Moved toward
18.8%
Net change +4.3 pp
Percent of all respondents; shared bar scale 0–40%. Net uses unrounded shares.
Question, source & data +Paired movement relative to the original choice. Net changes use unrounded figures. Study n=117, US IT leaders, September 27–28, 2026. Unweighted. Published figure 6. Item-specific bases are not supplied in the chart records.
Respondents switching toward or away from the specialist, compared with their original choiceResponseMeasureShare
IT leaders · Higher priceMoved away from specialist29.9%
IT leaders · Higher priceMoved toward specialist6.0%
IT leaders · Higher priceNet change-23.9net points
IT leaders · Verified benefitMoved away from specialist14.5%
IT leaders · Verified benefitMoved toward specialist18.8%
IT leaders · Verified benefitNet change+4.3net points
IT leaders · Longer rolloutMoved away from specialist34.2%
IT leaders · Longer rolloutMoved toward specialist8.5%
IT leaders · Longer rolloutNet change-25.6net points
View published research ↗
The rollout result appeared across company sizes. Specialist support fell from 67% to 42% at organizations with 200–999 employees, from 44% to 17% at 1,000–4,999, and from 57% to 32% at 5,000 or more. The last group contained fewer than 30 respondents, so the subgroup findings are directional.
COMPANY SIZE
Original Variant
† Fewer than 30 respondents; subgroup findings are directional. Each row uses a 0–100% scale.
Question, source & data +Share recommending the specialist within each company-size band. Study n=117, US IT leaders, September 27–28, 2026. Unweighted. Published figure 7. Item-specific bases are not supplied in the chart records.
Share recommending the specialist within each organization-size bandResponseMeasureShare
200-999 employeesOriginal67%
200-999 employeesVerified benefit67%
200-999 employeesLonger rollout42%
1,000-4,999 employeesOriginal44%
1,000-4,999 employeesVerified benefit59%
1,000-4,999 employeesLonger rollout17%
5,000+ employees †Original57%
5,000+ employees †Verified benefit54%
5,000+ employees †Longer rollout32%
View published research ↗
For an account team, this is a reason to revisit the deployment plan before adding another benefit slide. Find out what occupies those six weeks. If the buyer cannot free the people or obtain the approvals, a stronger product claim leaves the objection intact.
ROI, cost and time to value. Proven saving in our env matters. I picked existing when time doubled to 12 weeks.
CIO, financial services. Excerpt from the published respondent comment.
02THE CONSTRAINTS
The budget may grow.The project can still be blocked.
Ninety-five of the 117 participants expected the budget relevant to their work to increase. That is encouraging for suppliers. It does not tell them which projects the organization can absorb.
When participants named the constraints that most often stop a worthwhile investment, implementation capacity and security or compliance approval tied at 32%. Uncertain return followed at 30%, and funding at 27%. The spread is small. The useful question in a deal is which of these constraints needs resolving first.
21%put time to value among their top three decision criteria.
A recalled priority list is not a test of tolerance for delay.
EXHIBIT 02 / INVESTMENT BARRIERSA closely grouped set of constraints.
Share including each barrier in their top two
Implementation capacity32%
Security or compliance approval32%
Uncertain return30%
Disruption to operations28%
Funding27%
Competing executive priorities26%
Legacy integration23%
0%25%50%75%100%
Question, source & data +Multiple responses permitted; totals may exceed 100%. Study n=117, US IT leaders, September 27–28, 2026. Unweighted. Published figure 4. Item-specific bases are not supplied in the chart records.
Which two constraints most often stop a worthwhile technology investment from going ahead? Rank your top 2.ResponseMeasureShare
Implementation capacitySelected32%
Security or compliance approvalSelected32%
Uncertain returnSelected30%
Disruption to operationsSelected28%
FundingSelected27%
Competing executive prioritiesSelected26%
Legacy integrationSelected23%
View published research ↗
The priorities are broader than a cost-cutting brief, too. Reliability appeared in 45% of top-three outcome selections, business growth in 42%, and employee or customer experience in 40%. A proposal has to connect the operational improvement to the work the organization is trying to do.
One result would be easy to misread in a survey dashboard. Time to value appeared among the top three decision criteria for just 21%, well below proven effectiveness at 44%. Yet a longer rollout changed the fictional recommendation substantially. A recalled priority list and a concrete offer ask different questions. Low placement in the first does not make the criterion safe to ignore in the second.
Ask who will implement the change, what else those people are committed to, and what must happen before they can start. The answers belong in the proposal. Otherwise the delivery team may discover the constraint only after the sponsor has sold the idea internally.
I had to compromise on purchasing a new software solution due to a competing business deadline. It was a compromise because we needed the new technology
CIO, retail or CPG. Published respondent comment.
03THE EVIDENCE
Being known does notcomplete the investment case.
Analysts were the most common information source: 71% of participants used them to evaluate technology. Vendor content reached 56%, review sites 52%, and AI assistants or chat tools 45%. Those numbers describe where buyers look.
What they credited with influencing a recent decision was more specific. A trial in their own environment and a quantified business case each appeared in 32% of top-two selections. Analyst recommendations appeared in 16%. These are separate questions with different response formats, not stages in a measured funnel. Still, the practical distinction is useful: being known does not complete the investment case.
EXHIBIT 03 / DISCOVERY & DECISIONTrials and business cases lead the evidence buyers credit.
Which two types of evidence carried the most weight in that decision? Rank your top 2.
Results from a trial in our environment32%
A quantified business case32%
A security or compliance assessment30%
Technical documentation or a demo26%
An independent technical evaluation26%
An existing relationship or track record26%
An analyst recommendation16%
A relevant peer reference13%
0%25%50%75%100%
Top-two selections. Multiple responses permitted. These two questions do not measure stages of a funnel.
Both questions, sources & data +Study n=117; unweighted. Published figures 13 and 15. Sources used: multiple selection. Evidence credited: top two. Item-specific bases are not supplied.
When you're evaluating a new technology, which of these sources do you actually rely on?ResponseMeasureShare
Industry analystsSelected71%
Vendor websites, demos, or contentSelected56%
Review sitesSelected52%
AI assistants or chat toolsSelected45%
Colleagues on other internal teamsSelected43%
Conferences or eventsSelected42%
Peers at other organizationsSelected38%
Online communities or forumsSelected30%
Which two types of evidence carried the most weight in that decision? Rank your top 2.ResponseMeasureShare
Results from a trial in our environmentSelected32%
A quantified business caseSelected32%
A security or compliance assessmentSelected30%
Technical documentation or a demoSelected26%
An independent technical evaluationSelected26%
An existing relationship or track recordSelected26%
An analyst recommendationSelected16%
A relevant peer referenceSelected13%
77%needed more than one sign-off
27%needed four or more
The sponsor usually needed help getting to yes. Seventy-seven percent reported more than one sign-off; 27% needed four or more. Give that sponsor a document colleagues can inspect without attending the sales presentation. State the expected result, the assumptions behind it, the implementation demand, and the questions still open.
The comparison should include routes that generate no new software contract. Twenty-six percent built internally or adopted open source in the recalled decision. Another 9% stayed with the current approach without a new commitment. A competitor slide that lists only vendors misses those alternatives.
Most recalled decisions moved fairly quickly: 72% concluded within three months. That measures evaluation and approval, not deployment. Waiting until signature to involve delivery leaves little opportunity to address implementation concerns while the decision is still being made.
04THE CONTROL QUESTION
AI adoption is broad.Permission is specific.
Retiring an application is a different proposition from tuning resource allocation. Participants made that distinction even though most were already using AI: 43% had it in most team workflows and 42% used it day to day for some tasks.
For resource allocation, 46% would authorize production actions within approved limits and with exception review. For application retirement, only 32% would. Approval before every action was the most common retirement response, at 41%. A broad AI-adoption number misses this difference in authority.
EXHIBIT 04 / AUTHORIZATIONThe task changes what leaders will allow.
46%within approved limitsand exception review
31%human approvalbefore every action
What respondents would authorize under current controls. All five response categories shown; each row sums to 100% after rounding. No option permitted unrestricted autonomy.
Question, source & data +Stated authorization, not an inventory of permissions already running in production. Study n=117, US IT leaders, September 27–28, 2026. Unweighted. Published figure 9. Item-specific bases are not supplied in the chart records.
For each of these tasks, what's the highest level of automation you'd authorize today under your organization's current controls?ResponseMeasureShare
Optimize resource allocationNo automation3%
Optimize resource allocationSandbox or pilot only6%
Optimize resource allocationProduction, with human approval before each action31%
Optimize resource allocationProduction, within approved limits and exception review46%
Optimize resource allocationNot my decision or not sure14%
Change a production configurationNo automation5%
Change a production configurationSandbox or pilot only9%
Change a production configurationProduction, with human approval before each action39%
Change a production configurationProduction, within approved limits and exception review38%
Change a production configurationNot my decision or not sure9%
Retire a business applicationNo automation8%
Retire a business applicationSandbox or pilot only9%
Retire a business applicationProduction, with human approval before each action41%
Retire a business applicationProduction, within approved limits and exception review32%
Retire a business applicationNot my decision or not sure10%
View published research ↗
The distinction should be visible in a demonstration. Show the point where the system proposes an action, who can approve it, what it may do without asking, and what happens when it reaches a limit. A buyer should be able to follow an exception all the way back to a person.
These answers describe what respondents would authorize under current controls, not systems already operating at those levels. Even the most permissive response retained limits and exception review. There was no option for unrestricted autonomy.
Product and security teams should agree an approval policy for each action before expanding access. In a pilot, review overrides, exceptions, and recovery outcomes against agreed criteria. Counting users tells them how widely AI is used; it does not settle what those users should allow it to do.
05THE RESPONSE
Put the workinto the offer.
The first question for a stalled opportunity is worth changing. Before asking what further benefit would persuade the buyer, ask what makes the proposed work difficult to take on. The study points to four places to look. These are recommendations for practice, not interventions tested in the research.
01Put a delivery owner beside the account owner
+Have sales engineering and delivery agree the staffing, dependencies, security review, and first usable outcome before the proposal goes out. Keep a record of unresolved dependencies and start-date changes. Where capacity is tight, explore a smaller first deployment. Price is a separate discussion.
02Build the evidence with the reviewers
+Ask the sponsor who signs off and what each reviewer needs. Use that list to shape the trial and business case. Record which assumptions have been accepted and which remain disputed; do not count a document as complete merely because it has been sent.
03Price the alternatives honestly
+Finance and the business sponsor should compare the offer with renewal, internal development, open source, and staying put. Use their actual costs, effort, and service performance. If the current approach is adequate, the proposal needs a stronger reason to change, not a more flattering comparison.
04Make AI permissions part of acceptance
+For every production action, specify the approval rule, operating limits, exception route, and recovery process. Product, IT, and security owners should review the pilot against those requirements before authorizing broader use.
There is a promising message to test: 42% chose more predictable work as the promise most likely to earn a closer look, ahead of less manual effort at 29% and lower ongoing costs at 28%. The delivery plan is where that promise becomes credible. It should tell the buyer when the improvement arrives, what their team must contribute, and how the organization will stay in control.
THE PROMISE THAT EARNS A CLOSER LOOKMore predictable work42%
Less manual effort29%
Lower ongoing costs28%
Not sure1%
Single choice; published figure 14. Study n=117.
06SCOPE & METHODOLOGY
Know what thesenumbers can say.
117US IT leaders
200+Employees per organization
27–28 SEP2026 interview dates, UTC
UnweightedDescriptive findings
Gather’s IT Leaders Research Report covers 117 US respondents at organizations with at least 200 employees. Interview dates were September 27–28, 2026, UTC. One incomplete record was excluded. Results are unweighted and descriptive of the participants; this is not a population estimate for all US CIOs or IT leaders.
Sample, instrument & interpretation +Participants included heads of IT or IT directors (34.2%), VPs of IT or infrastructure (25.6%), CIOs (25.6%), CTOs whose primary mandate was enterprise IT (13.7%), and deputy CIOs (0.9%). The report is therefore described as IT-leader research rather than a CIO-only survey.
Technology companies accounted for 43.6% of respondents, retail or CPG for 22.2%, financial services for 14.5%, healthcare or life sciences for 12.8%, and manufacturing or logistics for 6.8%. Organization sizes were 200–999 employees (41%), 1,000–4,999 (35%), and 5,000 or more (24%). The technology-heavy composition limits broader generalization.
The instrument included reported priorities, budget expectations, a recalled technology decision, information and evidence sources, current team AI use, intended authorization, and a fictional choice exercise. Each choice variant reset to the original offer. Price, verification, and rollout variants were separate comparisons, not successive changes to one offer. Recommendations in that exercise are stated choices, not observed buying behavior.
Percentages retain the published precision. Top-two and top-three measures describe inclusion among selections, not first-place rankings; multiple-response totals can exceed 100%. Where published counts are available, percentage-point changes use those counts rather than rounded chart values. No statistical significance or population margin of error is claimed.
This edition reorganizes the published report and its downloadable aggregates. It does not reanalyze respondent-level records. The public methods note does not specify recruitment, response rate, interview mode, or the detailed quality-screening process beyond the incomplete-record exclusion. Those details should be confirmed before making broader methodological claims.
All 18 published source exhibits +These aggregates retain the original published labels and precision. They are the source values behind this interactive edition; they do not include individual responses.
1. Reliable operations support a wider business agenda
Which three outcomes matter most to your success over the next 12 months? Rank your top 3.
Improving reliability45%
Supporting revenue or business growth42%
Improving employee or customer experience40%
Delivering work faster34%
Reducing technical debt29%
Reducing total cost28%
Meeting compliance obligations27%
Building team capability27%
Reducing material risk26%
Top three selections · respondents may select more than one
2. Effectiveness needs integration and security fit
Which three criteria most influenced that decision? Rank them in order.
Proven effectiveness44%
Integration with our current environment42%
Security and compliance fit42%
Total cost, including implementation39%
Reliability and support39%
Flexibility and avoiding lock-in27%
Vendor stability and reputation25%
Time to value21%
Ease of use and team adoption21%
Top three selections · respondents may select more than one
3. Most expect a larger budget over the next year
Compared with the past 12 months, how do you expect the budget relevant to your work to change over the next 12 months?
Increase by 1% to 10%44%
Increase by more than 10%37%
Stay about the same14%
Decrease by 1% to 10%3%
I don't have a dedicated budget2%
Share of respondents · totals rounded to 100%
4. Capacity and approval are joint leaders among constraints
Which two constraints most often stop a worthwhile technology investment from going ahead? Rank your top 2.
Implementation capacity32%
Security or compliance approval32%
Uncertain return30%
Disruption to operations28%
Funding27%
Competing executive priorities26%
Legacy integration23%
Top two selections · respondents may select more than one
5. What changes the recommendation
Share recommending the new specialist under each fictional condition
Original offerIT leaders56%
Higher priceIT leaders32%
Verified benefitIT leaders61%
Longer rolloutIT leaders31%
Original offer: equal cost and six-week rollout; specialist claims 20% less manual effort versus 10%. Both options meet requirements, fit the existing stack, and can be funded. Variants independently raise its price by 20%, verify its benefit, or double rollout time. Each resets to the original offer; lines connect the comparisons, not a timeline.
6. The movement behind the net change
Respondents switching toward or away from the specialist, compared with their original choice
IT leaders · Higher priceMoved away: 29.9%
Moved toward: 6.0%
-23.9net points
IT leaders · Verified benefitMoved away: 14.5%
Moved toward: 18.8%
+4.3net points
IT leaders · Longer rolloutMoved away: 34.2%
Moved toward: 8.5%
-25.6net points
Percent of all respondents within each persona. Each half of the plot spans 0–50%. Net movement is calculated from unrounded shares.
7. How the response varies by company size
Share recommending the specialist within each organization-size band
200-999 employeesOriginal67%
200-999 employeesVerified benefit67%
200-999 employeesLonger rollout42%
1,000-4,999 employeesOriginal44%
1,000-4,999 employeesVerified benefit59%
1,000-4,999 employeesLonger rollout17%
5,000+ employees †Original57%
5,000+ employees †Verified benefit54%
5,000+ employees †Longer rollout32%
Darker cells indicate a higher share. † Fewer than 30 respondents; directional only.
8. AI use has moved into daily work
Where is your team today with using AI tools in its own work?
Built into most of our workflows43%
Using them day to day for some tasks42%
Piloting them as a team12%
Individuals are experimenting on their own2%
Not using them1%
Share of respondents · totals rounded to 100%
9. IT: permission changes with the action
For each of these tasks, what's the highest level of automation you'd authorize today under your organization's current controls?
Optimize resource allocationNo automation3%
Optimize resource allocationSandbox or pilot only6%
Optimize resource allocationProduction, with human approval before each action31%
Optimize resource allocationProduction, within approved limits and exception review46%
Optimize resource allocationNot my decision or not sure14%
Change a production configurationNo automation5%
Change a production configurationSandbox or pilot only9%
Change a production configurationProduction, with human approval before each action39%
Change a production configurationProduction, within approved limits and exception review38%
Change a production configurationNot my decision or not sure9%
Retire a business applicationNo automation8%
Retire a business applicationSandbox or pilot only9%
Retire a business applicationProduction, with human approval before each action41%
Retire a business applicationProduction, within approved limits and exception review32%
Retire a business applicationNot my decision or not sure10%
Each task totals 100% after rounding. “Approved limits” still includes exception review; it does not mean unrestricted autonomy.
10. Where the recent decision ended
What did your organization ultimately do?
Bought a new commercial solution32%
Expanded or renewed an existing supplier21%
Adopted or expanded open source17%
Continued a pilot or evaluation11%
Stayed with the current approach without a new commitment9%
Built it internally9%
Stopped or deferred the initiative1%
Share of respondents · totals rounded to 100%
11. How many people signed off
Counting yourself, how many people had to sign off before that decision was final?
2 or 350%
Just me23%
4 to 622%
7 or more5%
Share of respondents · totals rounded to 100%
12. How long the decision took
From the first serious look to a final decision, roughly how long did that decision take?
Less than a month22%
1 to 3 months50%
4 to 6 months23%
7 to 12 months4%
More than 12 months1%
Share of respondents · totals rounded to 100% · vertical scale 0–100%
13. Where respondents look for information
When you're evaluating a new technology, which of these sources do you actually rely on?
Industry analysts71%
Vendor websites, demos, or content56%
Review sites52%
AI assistants or chat tools45%
Colleagues on other internal teams43%
Conferences or events42%
Peers at other organizations38%
Online communities or forums30%
Sources used · respondents may select more than one
14. Which promise earns a closer look
Which of these messages would most likely earn a closer look from you for a tool in the category you described?
More predictable work42%
Less manual effort29%
Lower ongoing costs28%
Not sure1%
Share of respondents · totals rounded to 100% · vertical scale 0–100%
15. What carried weight in the recent decision
Which two types of evidence carried the most weight in that decision? Rank your top 2.
Results from a trial in our environment32%
A quantified business case32%
A security or compliance assessment30%
Technical documentation or a demo26%
An independent technical evaluation26%
An existing relationship or track record26%
An analyst recommendation16%
A relevant peer reference13%
Top two selections · respondents may select more than one
16. Roles
Head of IT or IT Director34.2%
VP of IT or VP of Infrastructure25.6%
CIO25.6%
CTO, with enterprise IT as my primary mandate13.7%
Deputy CIO0.9%
117 respondents
17. Industries
Technology43.6%
Retail or CPG22.2%
Financial services14.5%
Healthcare or life sciences12.8%
Manufacturing or logistics6.8%
117 respondents
18. Organization size
200-99941%
1,000-4,99935%
5,000+24%
117 respondents
SOURCE MATERIALReport series ↗Published aggregates ↗
Editorial review & AI-checker result +SAPLING / AI SCORE
77.7%Opening only: first 2000 characters. Full report not scored.
The score is a limited diagnostic, not proof of authorship or report quality. The full authored narrative, recommendations and methodology were submitted. Headings, chart labels and attributed quotations were excluded. The free Sapling service processes only the first 2,000 characters. The identical submitted prose previously scored 24.0% on model 1.3.4. This fresh result uses 1.3.5-cutover. AI Text Detector was retired after an older IDG control passage scored 75/100 and its feedback cited phrases absent from the drafts.
Editorial draft. The public source does not specify recruitment, response rate, interview mode, or detailed quality screening. Those details remain to be confirmed.

## Published charts

### 1. Reliable operations support a wider business agenda

Which three outcomes matter most to your success over the next 12 months? Rank your top 3.

1. Reliable operations support a wider business agendaWhich three outcomes matter most to your success over the next 12 months? Rank your top 3.Improving reliability45%Supporting revenue or business growth42%Improving employee or customer experience40%Delivering work faster34%Reducing technical debt29%Reducing total cost28%Meeting compliance obligations27%Building team capability27%Reducing material risk26%Top three selections · respondents may select more than one

### 2. Effectiveness needs integration and security fit

Which three criteria most influenced that decision? Rank them in order.

2. Effectiveness needs integration and security fitWhich three criteria most influenced that decision? Rank them in order.Proven effectiveness44%Integration with our current environment42%Security and compliance fit42%Total cost, including implementation39%Reliability and support39%Flexibility and avoiding lock-in27%Vendor stability and reputation25%Time to value21%Ease of use and team adoption21%Top three selections · respondents may select more than one

### 3. Most expect a larger budget over the next year

Compared with the past 12 months, how do you expect the budget relevant to your work to change over the next 12 months?

3. Most expect a larger budget over the next yearCompared with the past 12 months, how do you expect the budget relevant to your work to change over the next 12 months?Increase by 1% to 10%44%Increase by more than 10%37%Stay about the same14%Decrease by 1% to 10%3%I don't have a dedicated budget2%Share of respondents · totals rounded to 100%

### 4. Capacity and approval are joint leaders among constraints

Which two constraints most often stop a worthwhile technology investment from going ahead? Rank your top 2.

4. Capacity and approval are joint leaders among constraintsWhich two constraints most often stop a worthwhile technology investment from going ahead? Rank your top 2.Implementation capacity32%Security or compliance approval32%Uncertain return30%Disruption to operations28%Funding27%Competing executive priorities26%Legacy integration23%Top two selections · respondents may select more than one

### 5. What changes the recommendation

Share recommending the new specialist under each fictional condition

5. What changes the recommendationShare recommending the new specialist under each fictional conditionOriginal offerIT leaders56%Higher priceIT leaders32%Verified benefitIT leaders61%Longer rolloutIT leaders31%Original offer: equal cost and six-week rollout; specialist claims 20% less manual effort versus 10%. Both options meet requirements, fit the existing stack, and can be funded. Variants independently raise its price by 20%, verify its benefit, or double rollout time. Each resets to the original offer; lines connect the comparisons, not a timeline.

### 6. The movement behind the net change

Respondents switching toward or away from the specialist, compared with their original choice

6. The movement behind the net changeRespondents switching toward or away from the specialist, compared with their original choiceIT leaders · Higher priceMoved away: 29.9%Moved toward: 6.0%-23.9net pointsIT leaders · Verified benefitMoved away: 14.5%Moved toward: 18.8%+4.3net pointsIT leaders · Longer rolloutMoved away: 34.2%Moved toward: 8.5%-25.6net pointsPercent of all respondents within each persona. Each half of the plot spans 0–50%. Net movement is calculated from unrounded shares.

### 7. How the response varies by company size

Share recommending the specialist within each organization-size band

7. How the response varies by company sizeShare recommending the specialist within each organization-size band200-999 employeesOriginal67%200-999 employeesVerified benefit67%200-999 employeesLonger rollout42%1,000-4,999 employeesOriginal44%1,000-4,999 employeesVerified benefit59%1,000-4,999 employeesLonger rollout17%5,000+ employees †Original57%5,000+ employees †Verified benefit54%5,000+ employees †Longer rollout32%Darker cells indicate a higher share. † Fewer than 30 respondents; directional only.

### 8. AI use has moved into daily work

Where is your team today with using AI tools in its own work?

8. AI use has moved into daily workWhere is your team today with using AI tools in its own work?Built into most of our workflows43%Using them day to day for some tasks42%Piloting them as a team12%Individuals are experimenting on their own2%Not using them1%Share of respondents · totals rounded to 100%

### 9. IT: permission changes with the action

For each of these tasks, what's the highest level of automation you'd authorize today under your organization's current controls?

9. IT: permission changes with the actionFor each of these tasks, what's the highest level of automation you'd authorize today under your organization's current controls?Optimize resource allocationNo automation3%Optimize resource allocationSandbox or pilot only6%Optimize resource allocationProduction, with human approval before each action31%Optimize resource allocationProduction, within approved limits and exception review46%Optimize resource allocationNot my decision or not sure14%Change a production configurationNo automation5%Change a production configurationSandbox or pilot only9%Change a production configurationProduction, with human approval before each action39%Change a production configurationProduction, within approved limits and exception review38%Change a production configurationNot my decision or not sure9%Retire a business applicationNo automation8%Retire a business applicationSandbox or pilot only9%Retire a business applicationProduction, with human approval before each action41%Retire a business applicationProduction, within approved limits and exception review32%Retire a business applicationNot my decision or not sure10%Each task totals 100% after rounding. “Approved limits” still includes exception review; it does not mean unrestricted autonomy.

### 10. Where the recent decision ended

What did your organization ultimately do?

10. Where the recent decision endedWhat did your organization ultimately do?Bought a new commercial solution32%Expanded or renewed an existing supplier21%Adopted or expanded open source17%Continued a pilot or evaluation11%Stayed with the current approach without a new commitment9%Built it internally9%Stopped or deferred the initiative1%Share of respondents · totals rounded to 100%

### 11. How many people signed off

Counting yourself, how many people had to sign off before that decision was final?

11. How many people signed offCounting yourself, how many people had to sign off before that decision was final?2 or 350%Just me23%4 to 622%7 or more5%Share of respondents · totals rounded to 100%

### 12. How long the decision took

From the first serious look to a final decision, roughly how long did that decision take?

12. How long the decision tookFrom the first serious look to a final decision, roughly how long did that decision take?Less than a month22%1 to 3 months50%4 to 6 months23%7 to 12 months4%More than 12 months1%Share of respondents · totals rounded to 100% · vertical scale 0–100%

### 13. Where respondents look for information

When you're evaluating a new technology, which of these sources do you actually rely on?

13. Where respondents look for informationWhen you're evaluating a new technology, which of these sources do you actually rely on?Industry analysts71%Vendor websites, demos, or content56%Review sites52%AI assistants or chat tools45%Colleagues on other internal teams43%Conferences or events42%Peers at other organizations38%Online communities or forums30%Sources used · respondents may select more than one

### 14. Which promise earns a closer look

Which of these messages would most likely earn a closer look from you for a tool in the category you described?

14. Which promise earns a closer lookWhich of these messages would most likely earn a closer look from you for a tool in the category you described?More predictable work42%Less manual effort29%Lower ongoing costs28%Not sure1%Share of respondents · totals rounded to 100% · vertical scale 0–100%

### 15. What carried weight in the recent decision

Which two types of evidence carried the most weight in that decision? Rank your top 2.

15. What carried weight in the recent decisionWhich two types of evidence carried the most weight in that decision? Rank your top 2.Results from a trial in our environment32%A quantified business case32%A security or compliance assessment30%Technical documentation or a demo26%An independent technical evaluation26%An existing relationship or track record26%An analyst recommendation16%A relevant peer reference13%Top two selections · respondents may select more than one

### 16. Roles



16. RolesHead of IT or IT Director34.2%VP of IT or VP of Infrastructure25.6%CIO25.6%CTO, with enterprise IT as my primary mandate13.7%Deputy CIO0.9%117 respondents

### 17. Industries



17. IndustriesTechnology43.6%Retail or CPG22.2%Financial services14.5%Healthcare or life sciences12.8%Manufacturing or logistics6.8%117 respondents

### 18. Organization size



18. Organization size200-99941%1,000-4,99935%5,000+24%117 respondents

## Published tables

Share recommending the new specialist under each fictional condition

Response | Measure | Share
Original offer | IT leaders | 56%
Higher price | IT leaders | 32%
Verified benefit | IT leaders | 61%
Longer rollout | IT leaders | 31%

Respondents switching toward or away from the specialist, compared with their original choice

Response | Measure | Share
IT leaders · Higher price | Moved away from specialist | 29.9%
IT leaders · Higher price | Moved toward specialist | 6.0%
IT leaders · Higher price | Net change | -23.9net points
IT leaders · Verified benefit | Moved away from specialist | 14.5%
IT leaders · Verified benefit | Moved toward specialist | 18.8%
IT leaders · Verified benefit | Net change | +4.3net points
IT leaders · Longer rollout | Moved away from specialist | 34.2%
IT leaders · Longer rollout | Moved toward specialist | 8.5%
IT leaders · Longer rollout | Net change | -25.6net points

Share recommending the specialist within each organization-size band

Response | Measure | Share
200-999 employees | Original | 67%
200-999 employees | Verified benefit | 67%
200-999 employees | Longer rollout | 42%
1,000-4,999 employees | Original | 44%
1,000-4,999 employees | Verified benefit | 59%
1,000-4,999 employees | Longer rollout | 17%
5,000+ employees † | Original | 57%
5,000+ employees † | Verified benefit | 54%
5,000+ employees † | Longer rollout | 32%

Which two constraints most often stop a worthwhile technology investment from going ahead? Rank your top 2.

Response | Measure | Share
Implementation capacity | Selected | 32%
Security or compliance approval | Selected | 32%
Uncertain return | Selected | 30%
Disruption to operations | Selected | 28%
Funding | Selected | 27%
Competing executive priorities | Selected | 26%
Legacy integration | Selected | 23%

When you're evaluating a new technology, which of these sources do you actually rely on?

Response | Measure | Share
Industry analysts | Selected | 71%
Vendor websites, demos, or content | Selected | 56%
Review sites | Selected | 52%
AI assistants or chat tools | Selected | 45%
Colleagues on other internal teams | Selected | 43%
Conferences or events | Selected | 42%
Peers at other organizations | Selected | 38%
Online communities or forums | Selected | 30%

Which two types of evidence carried the most weight in that decision? Rank your top 2.

Response | Measure | Share
Results from a trial in our environment | Selected | 32%
A quantified business case | Selected | 32%
A security or compliance assessment | Selected | 30%
Technical documentation or a demo | Selected | 26%
An independent technical evaluation | Selected | 26%
An existing relationship or track record | Selected | 26%
An analyst recommendation | Selected | 16%
A relevant peer reference | Selected | 13%

For each of these tasks, what's the highest level of automation you'd authorize today under your organization's current controls?

Response | Measure | Share
Optimize resource allocation | No automation | 3%
Optimize resource allocation | Sandbox or pilot only | 6%
Optimize resource allocation | Production, with human approval before each action | 31%
Optimize resource allocation | Production, within approved limits and exception review | 46%
Optimize resource allocation | Not my decision or not sure | 14%
Change a production configuration | No automation | 5%
Change a production configuration | Sandbox or pilot only | 9%
Change a production configuration | Production, with human approval before each action | 39%
Change a production configuration | Production, within approved limits and exception review | 38%
Change a production configuration | Not my decision or not sure | 9%
Retire a business application | No automation | 8%
Retire a business application | Sandbox or pilot only | 9%
Retire a business application | Production, with human approval before each action | 41%
Retire a business application | Production, within approved limits and exception review | 32%
Retire a business application | Not my decision or not sure | 10%
